Decoration and literacy wood floor laying

2022-07-22
  • Detail

Wood floor is a common paving material for modern family floors. The floor is not a whole, and it needs to be paved piece by piece. It is often said that the floor is paved with three points of quality and seven points of quality, and the quality of pavement is particularly critical for the later use of the floor. The floor separation, air warping, creaking and even arching in some homes are largely caused by installation problems. Therefore, we must pay attention to the laying of wood floors

everyone can see the material of wood floor. What kind of product you choose will have what kind of effect. But if the wood floor is not laid well, the final effect will also be very collapse. I don't know if you have ever encountered the situation that the wood floor is not laid well and the gap is too large. In the process of laying wooden floors, if the workers' technical level is not up to standard, it is likely to make your floor look very bad. Today, Xiaobian has also collected a lot of information. Let's learn about the process of laying wooden floors

the meaning of wood floor laying

wood floor is a common laying material for modern family floors. The floor is not a whole and needs to be laid piece by piece. It is often said that the floor is paved with three points of quality and seven points of quality, and the quality of pavement is particularly critical for the later use of the floor. The floor separation, air warping, creaking and even arching in some homes are largely caused by installation problems. Therefore, we must pay attention to the laying of wood floors

wood floor laying process

three points of floor, seven points of installation. If consumers want to have a comfortable floor, not only the quality of the floor itself is better, but also the installation process of the floor is very important. In order to avoid various problems caused by improper floor installation in future home life, Bijia flooring experts will show consumers the installation process of multi-layer solid wood flooring in detail

I. measure the area of the room

before the floor is installed, it is necessary to accurately measure the paving area of the room, so as to know the material loss in the whole paving process

II. Base course treatment

the first step before formally paving the floor is base course treatment, which is mainly to repair the problem ground and form a new base course to avoid floor arching due to the hollowing and cracking of the original base course. After the base course is finished, the ground needs to be leveled. If the ground is uneven, it will not only lead to gaps in the skirting line, but also the overall floor will be uneven, and there will be abnormal noise, which will also seriously affect the quality of the floor

III. ground leveling

the horizontal error of the ground cannot exceed 2mm. If it exceeds 2mm, we must find a way to level it. If the ground is uneven, it will not only lead to gaps in the skirting line, but also the overall floor will be uneven, and there will be abnormal noise, which will also seriously affect the quality of the floor

IV. open the package to pick the color and determine the paving direction

before paving, the floor should be placed according to the principle of the same color and texture as far as possible. In this process, you can also check whether the floor has problems such as size or end cracking

v. clean the ground

clean the garbage on the ground, including every corner, because if the ground is not cleaned before paving, there will be “ Sha Sha ” The sound of

VI. lay moisture-proof membrane and keel

before formally paving the floor, the moisture-proof layer should be paved first, so as to prevent the floor from being affected by moisture in the future. The damp proof course shall be paved and the joints shall be close together

for the laying of solid wood flooring, the requirements for the flatness of the ground are not as harsh as laminate flooring and solid wood composite flooring, and the keel is the most important link. To ensure that the wood keel is generally made of dried fir or white pine. The keel shall be located on the moisture-proof isolation layer to protect the keel from moisture. It is better to leave 10mm&mdash between keel and wall, furniture, etc; 20mm expansion joint, leaving space for the thermal expansion and cold contraction of the floor

VII. Officially pave the floor

laying the floor does not seem to have a high technical content, but it still requires skills, not too much force, otherwise the splice will bulge. It is worth noting that the keel contacted by the floor must be fixed with a nail. When fixing the floor, pay attention to whether the floor has end cracks, the height difference between adjacent floors is too large, or the gap between panels is too large

VIII. Installation of skirting line

the thickness of skirting line must be able to cover the expansion joint between the floor surface and the wall. During installation, a gap of 1mm should be left between the floor and the surface layer to prevent the floor from expanding. The internal and external corners of the wooden skirting line shall be installed after cutting the corners, and the joints shall be sawn to 45 degrees for fixation

IX. cleaning

precautions for wood floor laying

acceptance of paving materials

important paving materials, such as wood floor, rough floor, wood-based panel, wood keel, floor nails, moisture-proof membrane, adhesive, waterproof coating, etc., should meet the relevant national standards and can be used only after passing the acceptance. In particular, consumers should pay special attention to the moisture content of the purchased wooden floor. Generally, floor manufacturers will provide door-to-door service, but if you have time, especially the owners who use floors in a large area, you'd better go to the manufacturer's warehouse or transfer station to inspect the goods in advance. Generally, the manufacturer will equip the warehouse with a rapid tester to test the moisture content

basic floor treatment

at present, there are two popular and widely used floor paving methods in the market. One is suspension pavement, which is mainly used for the pavement of laminate floor and solid wood composite floor. One is keel paving, which is popular for the paving of solid wood floors. The suspension paving method has high requirements for the flatness of the ground, so the ground must be leveled. For cement leveling, time must be allowed for the cement to dry fully. If the height difference per square meter of the ground exceeds 5mm, it cannot be installed. Please ask the construction workers to trim the protruding or uneven parts such as edges and corners on the basis of the ground leveling (measure the ground flatness with a two meter guiding rule, which is required to be no more than 3mm)

lay the floor and keel

the moisture-proof membrane should be kept intact, and if it is damaged, it should be repaired in time. Pay special attention to the moisture-proof isolation of the junction between the wooden floor and the floor tile or marble, as well as the protective isolation with the bathroom and kitchen. The height of the keel depends on the ground conditions, but it cannot be less than 1.5cm, and the width cannot be less than 3.5cm. Local unevenness should be repaired, and thick &le can be used; 5mm wood gasket shall be leveled. It should be reminded that after the keel is finished, it is necessary to clean and dust it, and then evenly spread moisture-proof agents and pesticides such as bamboo charcoal and camphor wood blocks

optional paved floor

the keel contacted by the floor must be fixed with a nail. When fixing the floor, pay attention to whether the floor has end cracks, the height difference between adjacent floors is too large, or the gap between panels is too large. The part of the floor embedded in the door frame and door pocket shall have an expansion gap of 8mm-12mm with the wall and door pocket. There should be a 1mm gap between the bottom of the door pocket and the floor surface, so as not to hinder the floor from wetting up in the plum rain season

installation of skirting line

check whether there is an air groove on the back of the skirting line and make anti-corrosion treatment. The depth of the ventilation slot shall not be less than 5mm, and the width shall not be less than 30mm

what the owner needs to pay attention to in this step

1 The moisture content of wood floor should be about 11%

2. After buying the floor home, it's best to put it down at a room temperature of 16 ℃ to 18 ℃ for two days

3. A floor expansion joint of about 1 cm shall be reserved between the floor and the wall

4. Within 48 hours after the floor is paved, avoid walking and placing heavy objects, and leave enough time for the floor to stick. The newly paved floor is best cleaned with a vacuum cleaner or broom

summary: after reading so much about the simple processes and precautions of wood flooring, everyone also knows the importance of wood flooring. If your family is about to lay wood flooring, then learn more about the relevant processes